amc repair maintenance installation tenders in west bengal
west bengal , purulia
- Eastern Coalfields Limited
- repairing the boundary wall & front open surface of community hall of kenda bouripara & ruidas para of new kenda colliery.
- Deadline : 02 May 2024
- Updated : 25 Apr 2024
- Value : 1.99 Lac
- Download
west bengal , purulia
- Eastern Coalfields Limited
- repairing of personnel manager office at chora 10 pit colliery of chora group under kenda area.
- Deadline : 02 May 2024
- Updated : 25 Apr 2024
- Value : 50 Thousand
- Download
west bengal , kolkata
- Bharat Heavy Electricals Limited
- repair, calibration, inspection, transportation and testing/demonstration of 01 no. foster make 50kv/5a ac hv test set
- Deadline : 04 May 2024
- Updated : 25 Apr 2024
- Value : Refer Document
- Download
west bengal , paschim bardhaman
- Eastern Coalfields Limited
- supply and installation of dgms approved flp light in underground of mic jpc.
- Deadline : 08 May 2024
- Updated : 24 Apr 2024
- Value : 19.19 Lac
- Download
west bengal , paschim bardhaman
- Eastern Coalfields Limited
- transportation installation commissioning necessary fabrication and trial run including civil work of one 1200 mm width 2x150kw 6.6kv pvc belt conveyor for a length of 420m from 3d/-4bl to 3d/-4nl cm panel- trunk road t5 in rv seam of mic jpc.
- Deadline : 08 May 2024
- Updated : 24 Apr 2024
- Value : 13.46 Lac
- Download
west bengal , paschim bardhaman
- Eastern Coalfields Limited
- installation of one no. 1 mva 3.3 kv/550v tsu at 8xd(old) substation at r-viia of 3&4 incline j.p.colly.
- Deadline : 08 May 2024
- Updated : 24 Apr 2024
- Value : 4.85 Lac
- Download
west bengal , paschim bardhaman
- Eastern Coalfields Limited
- dismantling, transportation, installation, commissioning & trial run including necessary fabrication jobs (including civil works) of one 800mm width, 1x 75kw, 550v, pvc belt conveyor for a length of 60m in 1100 m of new incline (along the incline) at mic, jhanjra project colliery.
- Deadline : 08 May 2024
- Updated : 24 Apr 2024
- Value : 4.74 Lac
- Download
west bengal , paschim bardhaman
- Eastern Coalfields Limited
- installation of 4r substation by transportation of transformers vcbs and cables to 4r/in between 4cl & 4bl for cm panel- trunk road t5 in rv seam of mic jhanjra project colliery.
- Deadline : 08 May 2024
- Updated : 24 Apr 2024
- Value : 4.25 Lac
- Download
west bengal , paschim bardhaman
- Eastern Coalfields Limited
- transportation and installation of one no 240mtr head/500gpm pump with 190kw/6.6kv motor on base frame after making pcc foundation for base frame and mounting of base frame by grouting with roof bolts at 23bd/11l of r-vi seam at mic jpc.
- Deadline : 08 May 2024
- Updated : 24 Apr 2024
- Value : 2.69 Lac
- Download
west bengal , paschim bardhaman
- Eastern Coalfields Limited
- installation of one no turbine pump with motorand starter at 1186m sdl section and installation of one no 205m 4inch dia ms pipeline(discharge at 0dr-vi) after transporting from surface and lifting of one no roto pump set(pump motor with baseframe)
- Deadline : 08 May 2024
- Updated : 24 Apr 2024
- Value : 2.37 Lac
- Download